top of page


22 Lankester Square, Oxted, RH8 0LJ, UK

 

We offer a professional and comprehensive bathroom installation and tiling services in the Kent area. Whether you would like a complete bathroom installation package or just require one or two bathroom appliances to be installed, WELLBUILD are here to help.

 

Our experienced bathroom fitters and tilers are skilled in installing various types of bathrooms, from small, budget-friendly ones to luxury bathrooms, shower rooms and wet rooms.

 

We know how to transform your bathroom into a stylish modern or traditional place, where taking a bath or shower becomes a real pleasure.

 

Do you have any questions or would you like to get a free quote? Contact us by calling: 07751 679 476 or send us an e-mail.

More


2TH FLOOR BATHROOM

 

 

 

 

Scope of work

  • Design

  • Turning off and disconnecting supply (water, heating, power)

  • Ripping out (toilet, sink, bath, boxing, tiles)

  • Removal of old suite and waste

  • Plumbing (pipework adjustments, toilet cistern frame installation)

  • Electrical work (extractor fan, ceiling lights, light switch, mirror light, heated towel rail, earth cable)

  • Dry lining walls & tile backer boards (Abacus elements backer board kit)

  • Bath boxing

  • Waterproofing membrane

  • Wall tiling 600x600 70no.

  • Floor tiling 600x600 15no.

  • Toilet installation (toilet, seat, flush plate, toilet roll holder, wall mounted toilet brush)

  • Basin installation (basin, tap, van unit, towel rail, mirror)

  • Bath installation (bath, tap, enclosure)

  • Heated towel rail installation

  • Door installation

  • Removal of waste

  • Finishing (ceiling painting)

 

 

 

Extra work

  • Bath front panel build on site and tiled 

  • New toiled recessed wall

  • New partition wall for mirror and plumbing work

  • Window reveals tiled 

  • New wall insulation

  • Install new extractor fan

  • Aluminium trims

BEDROOM 1 DOOR TO THE BATHROOM

  • Wall plastering

  • Wall paint

BEDROOM 1 WINDOW

  • Install new window sill

  • Walls around the window paint

  • Install the window shutter

BEDROOM 2 DOOR TO THE BATHROOM

  • Wall plastering

  • Wall paint

HALLWAY

  • Pain wall


1ST FLOOR ENSUITE

 

 

 

 

Scope of work

  • Design

  • Turning off and disconnecting supply (water, heating, power)

  • Ripping out (toilet, sink, bath, boxing, tiles)

  • Removal of old suite and waste

  • Service void & niches installation

  • Pocket door installation

  • Plumbing (pipework adjustments, toilet cistern frame installation)

  • Electrical work (extractor fan, ceiling lights, light switch, mirror light, heating mat, earth cable)

  • Dry lining walls & tile backer boards (Abacus elements backer board kit)

  • Toilet cistern boxing / ideally all pipework will be hidden under the floor or behind suite items unseen

  • Waterproofing membrane

  • Wall tiling 600x600 80no.

  • Floor tiling 600x600 15no.

  • Toilet installation (toilet, seat, flush plate, toilet roll holder, wall mounted toilet brush)

  • Basin installation (basin, tap, van unit, towel rail, mirror)

  • Shower installation (tray, tap, enclosure)

  • Removal of waste

  • Finishing (ceiling painting)

 

 

 

Extra work

  • Shower tray front panel build on site and tiled 

  • Window reveals tiled 

  • New wall insulation

  • Install  two new towel rails

  • Install new extractor fan (+ cost of new fan)

  • New pocket for door

  • Plaster wall with pocket door

  • Brass trims

WARDROBE

  • Install IKEA shelving

  • Paint the wardrobe walls and ceiling

  • Plaster the ceiling and walls around shelving

  • Install new lights (twice)

  • Fix the skirting boards in the wardrobe and paint

  • Remove the existing wardrobe

FIREPLACE

  • Remove the existing fireplace

  • Plaster wall

  • Paint wall

  • Install new skirting board and paint

  • Install new socket with USB (twice)

SHELVING

  • Cut the timber for shelving and paint

  • Install shelving

  • Paint the wall

BEDSIDE LAMPS

  • Install new cables

  • Install new lamps

  • Plastering work

  • Wall paint


GROUND FLOOR CLOAKROOM

 

 

 

 

Scope of work

  • Design

  • Turning off and disconnecting supply (water, heating, power)

  • Ripping out (toilet, sink, tiles)

  • Removal of old suite and waste

  • Plumbing (pipework adjustments, toilet cistern frame installation)

  • Electrical work (extractor fan, ceiling lights, mirror light, earth cable)

  • Dry lining walls

  • Toilet cistern boxing / ideally all pipework will be hidden under the floor or behind suite items unseen

  • Waterproofing membrane

  • Wall tiling 900x900 18no.

  • Floor tiling 900x900 2no.

  • Toilet installation (toilet, seat, flush plate, toilet roll holder, wall mounted toilet brush)

  • Basin installation (basin, tap, van unit, towel rail, mirror)

  • Removal of waste

  • Finishing (ceiling painting)

 

 

 

Extra work

  • Window reveals tiled

  • Install ceramic cover under the basin unit

  • Aluminium trims


INSPIRATION
 

bottom of page